RATIO Architects Plan Room
Public Projects
Private Projects
Addendum Watch
Bid Tab Watch
Sign In/Register
City of Elwood - Elwood Water Well - PH2 WTP Improvements
Information
Plan Holders
Plans
Specifications
Addenda
Bid Tab
Reference
Pre-Bid Information
Filter:
G100
COVER
0010-G100_COVER.pdf
G101
GENERAL INFORMATION SHEET
0020-G101.pdf
G200
STORMWATER POLLUTION PREVENTION PLAN
0030-G200.pdf
G201
EROSION CONTROL PLAN
0040-G201.pdf
G202
EROSION CONTROL DETAILS
0050-G202.pdf
C101
EXISTING SITE PLAN
0060-C101.pdf
C201
PROPOSED SITE PLAN
0070-C201.pdf
C202
ENLARGED SITE PLANS
0080-C202.pdf
C501
PROPOSED RAW FILTER WATER LINE PLAN & PROFILE
0090-C501.pdf
C502
PROPOSED RAW FILTER WATER LINE PLAN & PROFILE
0100-C502.pdf
C601
STANDARD DETAILS
0110-C601.pdf
D101
EXISTING WATER TREATMENT PLANT PLAN
0120-D101.pdf
D102
EXISTING WATER TREATMENT PLANT SECTIONS
0130-D102.pdf
D201
PROPOSED RAW WATER DETENTION TANK EXPANSION PLAN
0140-D201.pdf
D202
PROPOSED RAW WATER DETENTION TANK EXPANSION PIPING PLAN
0150-D202.pdf
D203
PROPOSED RAW WATER DETENTION TANK EXPANSION SECTION
0160-D203.pdf
S000
COVER SHEET
0170-S000.pdf
S100
FOUNDATION PLAN
0180-S100.pdf
S101
TOP SLAB PLAN
0190-S101.pdf
S200
GENERAL NOTES
0200-S200.pdf
S201
SCHEDULES
0210-S201.pdf
S300
TYPICAL DETAILS
0220-S300.pdf
S301
SECTIONS & DETAILS
0230-S301.pdf
E201
ELECTRICAL SITE PLAN
0240-E201.pdf
E901
ELECTRICAL ONE-LINE DIAGRAM
0250-E901.pdf
If you need assistance with the plan room please contact
Eastern Engineering here
or call Eastern Engineering Fishers at
(317) 598-0661
.
© Copyright Eastern Engineering 2001-2024