RATIO Architects Plan Room

HeaderHeader

Bartholomew C.S.C. - Lillian Schmitt E.S - Site Improvements & Renovations - BP#2 - 23073

Bartholomew C.S.C. - Lillian Schmitt E.S - Site Improvements & Renovations - BP#2 - 23073

Contact

Company Contact

Maxwell Construction
Max Otte
Location

Location


Pre-Bid Information

Pre-Bid Information

03/05/2024 09:00 AM ET
Prebid Meeting: 3/5/24 (9:00 AM) Prebid Location: Lillian Schmitt Elementary School Cafeteria 2675 California St, Columbus, IN 47201 (Please Enter Cafeteria Door 11 and Park at the ISC Building Parking Lot by Tennis Courts).
Bid Information

Bid Information

03/22/2024 02:00 PM ET

Bid Categories

BC-1: General Trades
BC-2: Sitework
BC-3: Site Concrete
BC-4: Countertops, Cabinetry, and Casework
BC-5: Framing, Drywall, and Acoustical Ceilings
BC-6: Flooring and Tiling
BC-7: Windows and Glazing
BC-8: Plumbing / Heating, Ventilation, and Air Conditioning
BC-9: Electrical and Technology
BC-10: Painting and Coating
BC-11: Roofing
Sub/Supplier
Plan Room
(C) Eastern Engineering Use Only

Description

Description

** Please note to bid this project as a Prime Tier-1 Contractor you must be prequalified. Any BC 1-11 bids received from contractors that are not Prequalified will be returned to bidder unopened.**

Job Purchase Information:

Bidding documents may be purchased per the options and pricing listed on the Order page (plus Processing/ECO fee, Shipping when applicable, and Tax). Credit Card or Eastern Engineering Charge Account required before printing purchases.

If you need your documents shipped, although the system will ask for your shipper number, plan holders will not be able to ship using their own shipper numbers for this job. Shipping charges (based on the weight of one set) are paid to Eastern Engineering and are posted on the Shipping Information tab.

*****ADDENDA ARE NOT INCLUDED IN PURCHASE SET PRICES UNLESS SPECIFICALLY STATED. ADDENDA ARE POSTED FOR DOWNLOADING ON THE INFORMATION AND ADDENDA TABS.*****

Addenda

  • 03/08/2024 - Addendum #1 (Specifications & Drawings) was issued  View Addendum
  • 03/15/2024 - Addendum #2 (Specifications & Drawings) was issued  View Addendum
  • 03/20/2024 - Addendum #3 (Specifications & Drawings) was issued  View Addendum