Hancock County - Office Renovations
Choose Plan Sheet:
«
G1.0 - TITLE SHEET
G1.1 - GENERAL NOTES AND INFORMATION
G1.2 - CODE ANALYSIS AND COMPLIANCE PLANS
G1.3 - ABBREVIATIONS AND ADA MOUNTING HEIGHTS
C0.0 - TOPOGRAPHIC SURVEY
C1.0 - SITE REMOVALS
C2.0 - SITE LAYOUT AND GEOMETRICS
C3.0 - SITE GRADING
C4.0 - SITE PLANTING PLAN
C5.0 - SITE DETAILS
C5.1 - SITE DETAILS-2
AD2.0 - LOWER LEVEL REMOVAL PLAN
AD2.1 - FIRST FLOOR REMOVAL PLAN
AD10.0 - LOWER LEVEL REMOVAL REFLECTED CEILING PLAN
AD10.1 - FIRST FLOOR REMOVAL REFLECTED CEILING PLAN
A2.0 - LOWER LEVEL FLOOR PLAN
A2.1 - FIRST FLOOR PLAN
A3.1 - ROOM FINISH AND PARTITION SCHEDULES
A3.2 - DOOR & FRAME SCHEDULE AND DOOR DETAILS
A3.3 - SIGNAGE
A4.1 - ROOF PLAN
A5.1 - EXTERIOR ELEVATIONS
A6.1 - BUILDING SECTIONS
A8.1 - CASEWORK PLANS AND ELEVATIONS
A8.2 - ENLARGED TOILET PLANS AND INTERIOR ELEVATIONS
A8.3 - ENLARGED TOILET PLANS & INTERIOR ELEVATIONS
A10.0 - LOWER LEVEL REFLECTED CEILING PLAN
A10.1 - FIRST FLOOR REFLECTED CEILING PLAN
S2.0 - STRUCTURAL RAMP PLAN
S2.1 - STRUCTURAL RAMP SECTIONS
S2.2 - STRUCTURAL RAMP ELEVATIONS
S2.3 - STRUCTURAL TYPICAL DETAILS
FP0.1 - GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
FPD1.0 - LOWER LEVEL FIRE PROTECTION REMOVAL PLAN
FPD1.1 - FIRST FLOOR FIRE PROTECTION REMOVAL PLAN
FP2.0 - LOWER LEVEL FIRE PROTECTION PLAN
FP2.1 - FIRST FLOOR FIRE PROTECTION PLAN
P0.1 - GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
PD1.0 - LOWER LEVEL PLUMBING REMOVAL PLAN
PD1.1 - FIRST FLOOR PLUMBING REMOVAL PLAN
P1.1 - UNDERFLOOR PLUMBING PLAN LOWER LEVEL
P2.1 - LOWER LEVEL OVERALL PLUMBING PLAN
P2.2 - FIRST FLOOR OVERALL PLUMBING PLAN
P2.3 - ROOF OVERALL PLUMBING PLAN
P3.2 - SANITARY AND VENT RISER DIAGRAMS
P4.1 - PLUMBING ENLARGED PLANS - LOWER LEVEL I
P4.2 - PLUMBING ENLARGED PLANS - LOWER LEVEL II
P4.3 - PLUMBING ENLARGED PLANS - FIRST FLOOR
P5.1 - PLUMBING DETAILS
P6.1 - EQUIPMENT AND FIXTURE SCHEDULES
M0.1 - GENERAL INFORMATION
MD1.0 - LOWER LEVEL MECHANICAL DUCTWORK REMOVAL PLAN
MD1.1 - FIRST FLOOR MECHANICAL DUCTWORK REMOVAL PLAN
MD1.2 - ROOF MECHANICAL DUCTWORK REMOVAL PLAN
MD2.0 - LOWER LEVEL MECHANICAL PIPING REMOVAL PLAN
MD2.1 - FIRST FLOOR MECHANICAL PIPING REMOVAL PLAN
MD2.2 - ROOF MECHANICAL PIPING REMOVAL PLAN
MD4.2 - MECHANICAL ROOMS ENLARGED DEMO PLANS
M1.0 - LOWER LEVEL MECHANICAL DUC1WORK PLAN
M1.1 - FIRST FLOOR MECHANICAL DUCTWORK PLAN
M1.2 - ROOF MECHANICAL DUCTWORK PLAN
M1.3 - LOWER LEVEL DUCTWORK PLAN INFASTRUCTURE ROUGH-IN ALTERNATE
M2.0 - LOWER LEVEL MECHANICAL PIPING PLAN
M2.1 - FIRST FLOOR MECHANICAL PIPING PLAN
M2.2 - ROOF MECHANICAL PIPING PLAN
M4.2 - MECHANICAL ROOMS ENLARGED PLANS
M5.1 - MECHANICAL DETAILS- I
M5.2 - MECHANICAL DETAILS - II
M5.3 - MECHANICAL DETAILS- Ill
M6.1 - MECHANICAL EQUIPMENT SCHEDULES-1
M7.1 - CONTROL SCHEMATICS
M7.2 - CONTROL SCHEMATICS - II
M7.3 - CONTROL SCHEMATICS - Ill
E0.1 - GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
ED2.0 - LOWER LEVEL POWER REMOVAL PLAN
ED2.1 - FIRST FLOOR POWER REMOVAL PLAN
ED2.2 - ROOF POWER REMOVAL PLAN
ED3.0 - LOWER LEVEL LIGHTING REMOVAL PLAN
ED3.1 - FIRST FLOOR AND ROOF LIGHTING REMOVAL PLAN
ED4.0 - LOWER LEVEL SYSTEMS REMOVAL PLAN
ED4.1 - FIRST FLOOR AND ROOF SYSTEMS REMOVAL PLANS
E2.0 - LOWER LEVEL POWER PLANS
E2.1 - FIRST FLOOR POWER PLAN
E2.2 - ROOF POWER PLAN
E3.0 - LOWER LEVEL LIGHTING PLAN
E3.1 - FIRST FLOOR AND ROOF LIGHTING PLAN
E4.0 - LOWER LEVEL SYSTEMS PLAN
E4.1 - FIRST FLOOR AND ROOF SYSTEMS PLANS
E5.1 - ELECTRICAL DETAILS - 1
E5.2 - ELECTRICAL DETAILS - 2
E5.3 - ELECTRICAL DETAILS - 3
E6.1 - ELECTRICAL SCHEDULES
E6.2 - PANELB0ARD SCHEDULES
E6.3 - PANELB0ARD SCHEDULES
E6.4 - PANELB0ARD SCHEDULES
E6.5 - PANELB0ARD SCHEDULES
E6.6 - PANELB0ARD SCHEDULES
E6.7 - PANELB0ARD SCHEDULES
E7.1 - ONE-LINE DIAGRAM - REMOVALS
E7.2 - ONE-LINE DIAGRAM - NEW WORK
Page:
Previous
Use Ctrl + mouse scroll wheel over the document to zoom.